1)Roofs on buildings G and H have been shingled. After installation, other trades drilled holes through the Roof.

2)To supply and install Two Ply SBS to curbs of roof hatches Two on each building.

Hrs/Qty Service Rate/PriceAdjustSub Total
40 Holes cut on Building H

Remove Shingles to gain access to roof Deck install Roof venting systems as required replace shingles that where removed

$100.000.00%$4,000.00
2 Building H Roof Hatches

supply and install 2 ply SBS torch on and strip in two roof hatches

$500.000.00%$1,000.00
14 Building G Holes Cut

Remove shingles as required to gain access to roof deck install vent systems as required

$100.000.00%$1,400.00
1 Building G Hatches

supply and install 2 ply SBS torch on and strip in two roof hatches

$500.000.00%$500.00
1 Building F

supply and install 2 ply SBS torch on and strip in one roof hatches

$500.000.00%$500.00
1 Less Agreed price from $250 pert hole to $100 per hole invoiced on 15151564

holes found on G and H Discounted price as found then to be so many more

$-1,800.000.00%$-1,800.00
1 less agreed negoitiation $-1,900.000.00%$-1,900.00
Sub Total $3,700.00
Tax $185.00
Total Due $3,885.00