Quote

From:
3278-240th Street,
Langley, BC,
V2Z 2J3
Tel: 604-308-1698

info@optimalcontracting.ca

Quote Number QUO-5171743
Quote Date May 7, 2020
Total $11,477.25
To:
Glenwood Village of the Park

10584 153 Street
Surrey B.C.

To supply and install Fast flow Funnel system and leaf box catchers.

Remove upper part of down pipes. Enlarge drain hole on gutter Install Fast Flow funnel and replace Pipe. (total of 118 Fast Flow Funnels)

Remove lower pipe cut out area to install Leaf catcher. Replace pipe (Total of 68 leaf Catchers)

make repairs to gutter and down pipes buildings # 5 and 14

To make repairs to roofing building 1

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Building # 1
$720.000.00%$720.00
1 Build 2
$910.000.00%$910.00
1 Building 3
$835.000.00%$835.00
1 Building # 4
$1,090.000.00%$1,090.00
1 Building # 5 + 6
$1,240.000.00%$1,240.00
1 Building #7
$625.000.00%$625.00
1 Build 11
$680.000.00%$680.00
1 Building #14
$995.000.00%$995.00
1 Build # 15
$670.000.00%$670.00
1 Building 18
$950.000.00%$950.00
1 Building 19
$1,125.000.00%$1,125.00
1 Building 14

supply and install new down Pipe

$175.000.00%$175.00
1 Building 5

Remove and install part of gutter system where hangers worn out install new Hangers to gutter system and re slope to give good water flow re join at corner

$250.000.00%$250.00
1 Building #1

to remove shingle on lower slope install extra W valley to allow water to flow past wall stopping leak

$700.000.00%$700.00
Sub Total $10,965.00
Tax $512.25
Total $11,477.25

Add a comment

Your email address will not be published. Required fields are marked *