Quote

From:
3278-240th Street,
Langley, BC,
V2Z 2J3
Tel: 604-308-1698

info@optimalcontracting.ca

Quote Number QUO-5171725
Quote Date March 9, 2020
Total $26,483.09
To:
Glenwood Village of the Park

10584 153 Street
Surrey B.C.

    To draw implement a Work Safe BC approved fall protection plan so that the scope of work can be performed legally, protecting the liabilities of all parties concerned

Gutters are to be fastened with 3/4" extruded hangers no less than 18" on centre using double strength #10 x 1 1/2" plated, deep-threaded wood screws. All outlets to be aluminum, 2 3/4" flush-mount style, fastened by two 1/4" stainless steel screws.

Supply and install ; Gutter system around Eaves of House  cutting in outlets and corners as required.

Supply and install ; Down pipes & Elbows mounted with colour matched strapping and Tile covers  

EXTRAS : #1  Fast flowing funnel system makes the gutter empty quicker also helps washing away small debris from gutter system.

EXTRAs : #2 Leaf catcher mounted towards lower part of down pipe to catch debris flowing down from gutter. periodically,  pull tray down to clean out debris this stops the garbage from getting into drain tile keeping it clean

 

Hrs/Qty Service Rate/PriceAdjustSub Total
1 building #11

install gutter system as required

$3,659.000.00%$3,659.00
1 extras to Building 11

supply and install high flow funnels X 10 ($20.00) leaf catchers leaf catchers x 9 ($30.00)

$470.000.00%$470.00
1 building #14

install gutter system as required

$3,300.000.00%$3,300.00
1 building #14 extras

supply and install high flow funnels x 8 ($20.00) - leaf catchers leaf catchers X 7 ($30.00)

$370.000.00%$370.00
1 Building #15

install gutter system as required

$3,905.000.00%$3,905.00
1 Building #15 Extras

supply and install high flow funnels x 10 ($20.00) - leaf catchers leaf catchers X 10 ($30.00)

$500.000.00%$500.00
1 building #18

install gutter system as required

$3,485.000.00%$3,485.00
1 Building # 18 Extras

supply and install high flow funnels x 10 ($20.00) - leaf catchers leaf catchers X 8 ($30.00)

$440.000.00%$440.00
1 Building # 19

install gutter system as required

$1,016.620.00%$1,016.62
1 Building # 19 Extras

supply and install high flow funnels x 14 ($20.00) - leaf catchers leaf catchers X 16 ($30.00)

$760.000.00%$760.00
1 garage # 12

install gutter system as required

$1,360.000.00%$1,360.00
1 Garage #12 Extras

supply and install high flow funnels x 4 ($20.00) - leaf catchers leaf catchers X 1 ($30.00)

$110.000.00%$110.00
1 garage #13

install gutter system as required

$1,340.000.00%$1,340.00
1 Garage extras #13

supply and install high flow funnels x 4 ($20.00) - leaf catchers X 2 ($30.00)

$140.000.00%$140.00
1 Garage #16

install gutter system as required

$1,275.000.00%$1,275.00
1 Garage extras #16

supply and install high flow funnels x 3 ($20.00) - leaf catchers X 3 ($30.00)

$150.000.00%$150.00
1 Garage #17

install gutter system as required

$1,275.000.00%$1,275.00
1 Garage extras # 17

supply and install high flow funnels x 3 ($20.00) - leaf catchers X 3 ($30.00)

$90.000.00%$90.00
Sub Total $23,645.62
Tax $2,837.47
Total $26,483.09